Final Project
Tasks: 
  You have been contracted by 
HomeRun
  to design and implement the software components of the
  Safe@Home system.
  
 
Documents: 
  The following documents exist:
    
 
Expectations: 
  Of course, your design must consider all of the design
  documents that have been developed for Safe@Home.  In addition, your
  design must consider the other products 
  that  
HomeRun is currently considering.